Note - Due to Covid-19 delivery of your order may get delayed. Sorry for the inconvenience. We will surely ship your order out.
 
About the Book
This exceptionally produced trainee guide features a highly illustrated design, technical hints and tips from industry experts, review questions and a whole lot more! Key content includes General Maintenance and Winterizing Pipeline Equipment, Pipeline Damage Inspection (CT 34 and 35), Performing In-Line Inspections (CT 29), Pipeline Repair (CT 9.5, 37, 40.1, 40.2, 40.3, 40.4, 40.5, 40.7, and 40.91), Relocating and Lowering Pipelines (CT 33 and 34), Hot Tapping and Stoppling(R) - 2.5 and Larger (CT 40.6, 40.8, 40.9, and 40.91), Tank Repair, Maintenance Welding on Pipelines (CT 42), Performing Pipeline Disconnection Procedures (CT 36) and Vault Maintenance and Confined Space Entry (CT 59). Instructor Supplements Instructors: Product supplements may be ordered directly through OASIS at http: //oasis.pearson.com. For more information contact your Pearson NCCER/Contren Sales Specialist at http: //nccer.pearsonconstructionbooks.com/store/sales.aspx. * Annotated Instructor's Guide Paperback 0-13-101078-6 * Computerized Testing Software 0-13-103328-X * Transparency Masters 0-13-103329
Book Details
ISBN-13: 9780131010772
Publisher: Prentice Hall
Publisher Imprint: PRENTICE HALL
Edition: 1
Language: English
Returnable: N
Spine Width: 19 mm
Width: 212 mm
ISBN-10: 0131010778
Publisher Date: 07 Mar 2003
Binding: Paperback
Height: 278 mm
No of Pages: 3
Series Title: Contren Learning
Weight: 726.4 gr
User Reviews

Be the first to Write a Review on this book Pipeline Maintenance Level 3 Trainee Guide, Perfect Bound